Requirements of Regulation 521.10.202: Premature collapse of wiring systems | Scolmore Group

Requirements of Regulation 521.10.202: Premature collapse of wiring systems | Scolmore Group

Jake Green, Technical Engagement Manager at Scolmore Group, considers the general requirements of Regulation 521.10.202.

After several tragedies, Regulation 521.11.201 (AMD 3 BS 7671: 2008) was introduced; its purpose being to limit the risk to firefighters from entanglement by cables when they entered or exited a premises.

This regulation has now been renumbered as 521.10.202 but remains essentially the same, except for the removal of any reference to escape routes. It now reads: β€œWiring systems shall be supported such that they will not be liable to premature collapse in the event of a fire.”

This requirement shouldn’t be confused with the recommendations of standards like BS 5266-1 (emergency lighting) and BS 5839-1 (fire detection and fire alarm systems), which recommend methods of cable support to maintain circuit integrity during a fire.

Escape routes and BS 7671

The original regulation referred to escape routes, and this generated some confusion: β€˜How should escape route be defined?’ BS 7671 defined escape routes differently to that used in other guides, regulations, and legislation. For example:

● BS 7671 – β€˜Path to follow for access to a safe area in the event of an emergency’.

● Building standards technical handbook – β€˜β€¦ means a route by which a person may reach a place of safety…’

● Approved Document B in England and Wales – β€˜β€¦ that part which a person has to traverse before reaching either the safety of a final exit or the comparative safety of a protected escape route…’

The removal of β€˜escape routes’ from the regulation now means that it applies to ALL areas of the installation.

Premature collapse

There is no specific definition of β€˜premature collapse’ to be found in Part 2 of BS 7671. One dictionary definition of β€˜premature’ is, β€˜occurring or done before the usual or proper time; too early’.

Since the purpose of Regulation 521.10.202 isn’t to maintain the critical signal path, rather to limit the risk to firefighters, premature collapse should be considered in relation to that single purpose.

Electrical contractors and network installers are not best able to judge how fires behave, the likely temperatures that will be attained, nor how firefighters will carry out their role within a premises that is on fire. It is important therefore, that electrical professionals give due consideration to the support given to wiring systems to provide maximum reasonable application of Regulation 521.10.202.

Unicrimp offers a comprehensive range of cable accessories within its Q-Fire fire-rated range that are designed to provide the necessary protection from premature collapse.

There is a great deal of responsibility placed on contractors to apply Regulation 521.10.202, not because they want to meet minimum expectations, rather because they want to protect firefighters.

An electrical contractor should consider, as a minimum, the following:

● Wall fixings

● Careful consideration should be given to the mass of the wiring system that is to be supported (including the trunking, cable tray, etc. with the cables in-situ).

● Will the structure of the building maintain sufficient fire resistance to permit cables to avoid the need for metallic supports? Will such supports be sufficient if firefighters damage ceilings when applying water?

● Cable clips – metallic clips are essential as indicated by Note 3 and 4 of Regulation 521.10.202.

● Brackets or internal clips for PVC trunking – to keep the lid or cables in place (see Note 3 of Regulation 521.10.202).

To browse the full Unicrimp Q-Fire range, click here